Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2546

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲视频一区在线 | 国产午夜免费不卡精品理论片 | 日本 国产 欧美 | 在线观看国产免费高清不卡 | 国产在线第一区二区三区可以下载 | 露脸国产精品自产在线播 | 日韩手机看片 | 亚洲欧美日本国产一区二区三区 | 亚洲三级免费 | 91成人免费福利网站在线 | 高h全肉动漫在线观看最新 高h全肉动漫在线观看免费 | 四虎影视永久地址www成人污 | 亚洲一区二区三区免费在线观看 | 国产精品久久久久国产精品 | 中文字幕在线一区二区三区 | 国内精品久久久久久久久蜜桃 | 家庭教师免费观看 | 天堂网视频在线观看 | 99re久久 | 91色在线视频| 四虎永久在线精品国产馆v视影院 | 在线观看视频色 | 日韩经典在线 | 天堂激情 | 精品国产一级毛片大全 | 在线亚洲观看 | 三级国产精品一区二区 | 成年美女黄网站色大免费视频 | 污污的网站免费 | 韩国年轻漂亮女教师6 | 免费黄网站在线看 | 天天操妹子 | 国产一在线精品一区在线观看 | 国产一区亚洲二区三区 | 国产国语一级a毛片高清视频 | 在线观看日本www | 一级黄色片在线看 | 久久www免费人成精品香蕉 | 麻豆视频观看 | 97免费在线观看视频 | 黄色网页在线播放 |