欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Installation details that must be paid attention to in steel structure processing
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2605

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产一级特黄在线视频 | 欧美亚洲国产日韩综合在线播放 | 日本天天操 | 国产91免费在线观看 | 色香视频在线观看 | 日本不卡视频 | 久久国产精品免费一区二区三区 | tube.8xxxxvedeo| 五月婷婷婷婷婷 | 欧美成年人视频 | 精品亚洲欧美中文字幕在线看 | 欧美99 | 国产一区二区免费播放 | 成年美女黄网站色视频大全免费 | 色天天综合色天天碰 | 精品卡1卡2卡三卡免费视频 | 欧美国产伦久久久久 | 综合色播| 日韩免费片 | 欧美色久| 国产在亚洲线视频观看 | 看黄视频网站 | 欧美成人手机在线 | 国产精品成人四虎免费视频 | 色手机在线 | 在线私拍国产福利精品 | 成人影院人人免费 | 国产日韩在线观看视频网站 | 国产二区在线播放 | 国产色司机在线视频免费观看 | 9热在线精品视频观看 | 在线性视频 | 欧美一级高清免费a | 女人18毛片特级一级免费视频 | 日日夜夜精品视频 | 青青草久草 | 欧美专区视频 | 亚洲成人免费在线 | 男女性高爱麻豆 | bt岛www| 亚洲mm色国产网站 |