欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2962

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品久久久久毛片真精品 | 亚洲精品成人久久久影院 | 美女的隐私免费看无遮挡 | 色婷婷综合久久久久中文一区二区 | 97视频免费 | 成人深夜福利在线播放不卡 | 国产香蕉尹人视频在线香蕉视 | 青青青国产依人在在线观看高 | 国产成人aaa在线视频免费观看 | 日韩欧美在线中文字幕 | 久久香蕉国产精品一区二区三 | 妻子的诱惑03中文字幕 | 日日摸夜夜摸狠狠摸97 | 亚洲欧美一区二区三区另类 | 久久精品福利视频 | 国产毛片a| 中国一级片在线观看 | a级黄色毛片三个搞一 | 国产福利在线免费观看 | 交欧美 | 中文字幕曰韩一区二区不卡 | 日韩成人动漫在线观看 | 亚洲黄色一级大片 | 麻豆成人久久精品二区三 | 在线观看亚洲欧美 | 国产精品第一页在线 | 亚洲资源在线视频 | 成人日韩在线 | 久久久久国产精品免费免费 | 日韩欧美国产视频 | 国产91区| 亚洲综合日韩中文字幕v在线 | 亚洲高清在线视频 | 国产高清自拍 | 欧美高清日本三级人妇 | 日韩欧美一及在线播放 | 青草香蕉视频 | 日韩免费高清视频网站 | h成人3d动漫在线观看网站 | 网色 | 国产一区二区免费在线 |