欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3321

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线视频一区二区三区 | 国产精品麻豆入口 | 日韩高清性爽一级毛片免费 | 国产精品自产拍在线网站 | 麻豆va亚洲va欧美va天堂 | 91欧美精品 | 日本一区2区 | 在线播放第一页 | 国产精品久久毛片完整版 | 亚洲日韩中文字幕在线播放 | 亚欧精品在线观看 | 精品色网 | 欧美 国产 日本 | 黑色皮革手册在线观看 | 男人天堂2019 | 九色自拍视频 | 在线观看成年美女黄网色视频 | 亚洲欧美国产另类 | 狠狠色丁香久久婷婷综合丁香 | 国产成人午夜性a一级毛片 国产成人午夜视频 | 手机看片亚洲 | 免费国产黄网站在线观看 | 日韩欧美中文字幕在线视频 | 激情欧美一区二区三区 | 91久久青青青国产免费 | 一级待一黄aaa大片在线还看 | 亚洲日本一区二区三区 | 免费国产不卡午夜福在线观看 | 狠狠色综合久久久久尤物 | 福利在线一区二区 | 成人97在线观看免费高清 | 欧美日韩精品一区二区三区四区 | 我去色| 欧美日韩激情一区二区三区 | 精品精品国产高清a级毛片 精品精品国产yyy5857香蕉 | 好吊色欧美一区二区三区视频 | 日日干综合 | 欧美三级久久 | 欧美日韩在线看 | 国产欧美日韩不卡一区二区三区 | 精品福利在线观看 |