欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3550

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 国产精品va一区二区三区 | 在线成人免费视频 | 国产女精品 | 国产videos hd | 四虎视屏| 久久精品国产国产精品四凭 | 成人一区在线 | aaa毛片手机在线现看 | 国产精品香蕉成人网在线观看 | 久操久热| 99视频在线 | 天天舔天天操天天干 | 国产精品成人观看视频免费 | 欧美视频图片 | 国产日韩欧美在线一二三四 | 午夜网站入口 | 欧美视频一区 | 亚洲va欧美va人人爽夜夜嗨 | 国产高清国产专区国产精品 | 91香蕉成人免费高清网站 | 国产精品高清在线观看地址 | 久久九九有精品国产56 | 精品视频在线免费 | 日本一区二区三区国产 | 午夜在线播放免费人成无 | 欧美理论影院在线观看免费 | 久久精品国产99国产精品 | 韩国福利一区二区三区高清视频 | 南京巨根无套操到你窒息 | 久久优 | 九九在线视频 | 天堂网最新 | 日韩欧美国产高清 | 狠狠操狠狠操 | 欧美日本一区二区三区 | 国产免费一级在线观看 | 亚洲 欧洲 另类 综合 自拍 | 成人福利在线视频 | 国产毛片a | 97视频在线观看免费视频 | 九九免费高清在线观看视频 |