Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5164

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青草亚洲 | 自拍亚洲欧美 | 日产精品1卡二卡三卡乱码在线 | 欧美99视频 | 国产精品午夜久久久久久99热 | 天堂在线免费观看 | 欧美成人免费观看的 | 韩国免费人成在线观看网站 | 欧美日一区二区三区 | 97在线免费视频观看 | 干干操| 亚洲欧美日本国产一区二区三区 | 久热这里只有精品在线 | 国产色婷婷精品综合在线观看 | 日日噜噜夜夜狠狠视频欧美人 | 成人在线午夜 | 99视屏 | 18美女福利视频网站免费观看 | 毛片在线播 | 国产v片 | 日本三级免费 | 亚洲性xx| 日产精品一卡2卡三卡4乱码久久 | 国产在线观看99 | 特级一级毛片免费完整版视频 | 岛国在线播放v片免费 | 亚洲国产欧美在线不卡中文 | 免费看男女做好爽好硬视频 | 欧美国产亚洲一区二区三区 | 亚洲免费色视频 | 久久九九视频 | 色综合天天综合网看在线影院 | 丝袜美腿视频一区二区三区 | 久久国内 | 亚洲欧美一二三区 | 柳岩ai换脸被| 国产精品v一区二区三区 | 清纯唯美亚洲综合欧美色 | 免费看片亚洲 | 四虎天堂 | h番无遮挡动漫在线观看 |