欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Steel structure engineering foundation inspection General requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

Steel structure engineering foundation inspection General requirements

Time:[2016-3-2]  Hits:5077

Steel structure engineering foundation inspection General requirements

Guangzhou before the installation of steel structures to deal with the positioning axis, foundation and elevation axes, anchor bolt size and location of the building, etc. for review, and should be the foundation for the handover inspection and acceptance. Such as the need to review the bolt axis of each bolt, elevation that exceeds regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual drilling bolt position again.

Guangzhou Steel when foundation works in case of partial handover, handover acceptance each column base capable of forming at least a foundation degree space steel mounting unit, and should be consistent with the following provisions: foundation concrete strength to meet the design requirements; compacted backfill around the foundation end; bedrock elevation and symbolic reference axis point and accurate and complete; the top surface of the foundation should be flat, the foundation should look at the secondary irrigation cutting hair, anchor bolts should be intact.

The column axis position measured in column base outer shells.

The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base level design), the installation is a steel plate or early adoption sit pulp carrier plate leveling.

When using steel plate made of the support plate, the steel plate area should be based on lower compressive strength of concrete foundation, columns soles of the feet before the bottom of the column subjected to secondary grouting fastening bolt tension load and accounting determination. Pad in contact with the root surface and the bottom surface of the column should be flat, tight.

When the pulp should be used to sit for the board to shorten the no-mortar, mortar pads before lifting the column strength should be higher than a level foundation concrete strength and mortar pad area should be sufficient to meet carrier requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青青手机在线观看 | 91极品反差婊在线观看 | 成人ww| 亚洲黄色片网站 | 国产在线一区二区 | 99免费视频观看 | 第三人称复仇韩剧在线观看免费 | 黄a在线观看 | 久久艹视频 | 在线91av| 日欧毛片| 两个人免费观看高清视频韩国 | 99国产精品免费观看视频 | 亚州中文| 欧美一二三区 | 日韩美a一级毛片 | 精品欧美一区二区三区精品久久 | 日韩欧美不卡一区二区三区 | 亚洲精品手机在线观看 | 无人区国语版免费观看 | 视频一区二区三区蜜桃麻豆 | 日韩 视频在线播放 | 国产免费专区 | 精品国产欧美 | 成人免费福利片在线观看 | 九九九精品午夜在线观看 | 欧美视频网站免费看 | 青青国产精品视频 | 一区视频在线播放 | 日本人jizz| 久久国产亚洲欧美日韩精品 | 幻女free性zozo仙踪林 | 一级毛片视频 | a欧美视频 | 久久久久久免费视频 | 国产极品美女网站在线观看 | 国产精品麻豆免费版 | 最新高清无码专区 | 99国产高清久久久久久网站 | 激情六月婷婷 | 99re免费视频精品全部 |