欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5115

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91福利精品老师国产自产在线 | 日本大片在线免费观看 | 热99这里只有精品 | 欧美在线va在线播放 | 美国性大片在线观看免费 | 黄色国产在线视频 | 日韩在线一区高清在线 | 国产精品v欧美精品∨日韩 国产精品va在线观看一 | 一区二区三区欧美日韩国产 | 免费色视频 | 欧美日日日 | 亚洲成人在线网 | 日韩五月天 | 日本精品一区二区三区在线观看 | 午夜国产在线视频 | а天堂中文最新版在线官网视频 | 欧美日韩一区二区三区色综合 | h免费看 | 日韩欧美视频在线 | 午夜精品视频在线观看 | 欧洲第一区第二区第三区 | 草草线在成年免费视频网站 | 无限看片动漫的视频在线观看免费 | 网色 | 国产一级毛片夜一级毛片 | 日韩精品在线播放 | 欧美vide| 国产香蕉视频在线播放 | 九九手机视频 | 欧美日韩亚洲精品国产色 | 麻豆高清在线 | 91福利精品老师国产自产在线 | 欧美午夜精品久久久久免费视 | 国产99视频精品免费视频免里 | 国产三级精品三级在专区 | 日本免费网 | 激性欧美激情在线播放16页 | 久久久国产精品免费看 | 亚洲欧洲日产v特级毛片 | 四虎在线永久免费观看 | 青青青在线视频播放 |