欧美成人性色xxxx视频-欧美成人性色区-欧美成人性色生活片免费在线观看-欧美成人性视频播放-a级特黄-a级亚洲片精品久久久久久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ggscp.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5756

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青草视频在线观看视频 | 日本韩国一免费观看 | 亚洲一级在线观看 | hd性欧美| 天堂素人约啪 | 国产一区二区免费播放 | 阿v视频在线免费观看 | 欧美中文字幕第一页 | 亚洲一区二区三区深夜天堂 | 欧美黄色性视频 | 亚洲高清免费观看 | 一区二区在线欧美日韩中文 | 亚久久伊人精品青青草原2020 | 国产黄色在线免费观看 | 香蕉女郎 | 国产精品亚洲精品青青青 | 在线观看男女男免费视频 | 精品国产成人 | 国产精品九九免费视频 | 农村寡妇一级毛片免费看视频 | 日本www在线视频 | 亚洲日本在线观看 | 97在线视频网站 | 91精品国产综合成人 | 四虎国产免费 | 久久66热re国产毛片基地 | 在线播放色 | 欧美日韩福利视频一区二区三区 | 高清国产精品久久 | 在线观看黄页 | 好男人官网在线手机免费观看 | 男女污污在线观看 | 在线另类视频 | 天堂最新版免费观看 | 欧美日韩国产一区二区三区播放 | 日韩城人免费 | 亚洲最色网 | 欧美视频在线不卡 | 精品一区二区三区高清免费不卡 | 久久精品毛片 | 香蕉视频免费播放 |